Claims Under Multiple Contracts in a Single ICC Arbitration

The ICC multi contract claims Article 10 rule lets claims under several contracts proceed in a single arbitration, but only where the arbitration agreements are compatible and the parties may have agreed to joint determination. This note explains the test, the Court’s prima facie role and the drafting choices that decide outcomes.

Diagram of ICC multi contract claims Article 10 linking several contracts to one arbitration under the 2026 Rules

Key takeaways

  • Article 10 of the 2026 Rules allows claims under several contracts in one ICC arbitration.
  • It is subject to Article 7: arbitration agreements must be compatible and all parties must have agreed.
  • The Court applies a prima facie test only; the tribunal decides finally.
  • Different seats, tribunal sizes or appointment methods are the usual compatibility problems.
  • New claims under further contracts need tribunal authorisation after the initial CMC under Article 25.
  • Identical clauses and express consent wording remove most of the risk.

ICC multi contract claims Article 10: the short answer

The ICC multi contract claims Article 10 rule is short. Under Article 10 of the 2026 ICC Rules, claims arising out of or in connection with more than one contract may be made in a single arbitration, whether they are made under one arbitration agreement or under several arbitration agreements under the Rules. The permission is expressly subject to Articles 7(1) to 7(6), which decide whether claims under different agreements can actually stay together. In practice, the two questions are whether the arbitration agreements are compatible and whether all parties may have agreed to a single arbitration.

Diagram of ICC multi contract claims Article 10 linking several contracts to one arbitration under the 2026 Rules
Several contracts, one arbitration: Article 10 opens the door, and Article 7 decides who may walk through it.

Article 10 carries forward Article 9 of the 2021 Rules almost word for word, as the ICC’s compared version of the 2021 and 2026 Rules shows.

The renumbering follows the insertion of new provisions earlier in the Rules, and the old cross-reference to the 2021 new-claims rule in Article 23(4) has gone, because Article 25 now applies to all claims after the initial case management conference. Article 10 applies to arbitrations commenced on or after 1 June 2026 unless the parties agreed otherwise. This note explains the compatibility test, the consent requirement, the procedure before the ICC Court and the arbitral tribunal, and the drafting choices that make a multi-contract case work.

How Article 10 fits with Articles 5, 6, 7 and 11

Article 10 does not operate alone. It sits inside a group of provisions that the 2026 Rules place under the heading “Multiple Parties, Multiple Contracts and Consolidation”, alongside joinder (Article 8), claims between multiple parties (Article 9) and consolidation (Article 11). The pleading rules support it: Article 5(3)(f) requires a claimant whose claims are made under more than one arbitration agreement to indicate the agreement under which each claim is made, and Article 6(5)(d) imposes the same discipline on counterclaims.

The decisive link is Article 7. Under Article 7(1), if a party raises a plea concerning whether all of the claims may be determined together in a single arbitration, the arbitration proceeds and the arbitral tribunal decides the question directly, unless the Secretary General refers it to the Court before the tribunal is constituted. Where a referral is made, Article 7(2)(b) allows the arbitration to proceed as to claims under several agreements only if the Court is prima facie satisfied that the agreements may be compatible and that all parties may have agreed that those claims can be determined together.

The Court’s decision is provisional. Article 7(3) states that it is without prejudice to admissibility or the merits, and Article 7(4) leaves the tribunal to decide its own jurisdiction except for claims the Court has excluded. Under Article 7(6), a claim the Court excludes may be reintroduced later in other proceedings. Our guide to the ICC Court’s prima facie review and the companion note on Article 7 jurisdiction explain that screening stage in detail.

Consolidation is the alternative route. If separate arbitrations have already been started, Article 11(1)(c) allows the Court, at a party’s request, to consolidate arbitrations under different arbitration agreements where they are between the same parties, the disputes arise in connection with the same legal relationship and the Court finds the agreements compatible. The 1 June 2026 Note to Parties and Arbitral Tribunals illustrates this with a share purchase agreement and a shareholders’ agreement between the same parties.

Compatibility of arbitration agreements: what the test looks at

Neither the Rules nor the Note define “compatible”. The working idea is simple: two arbitration agreements are compatible if one tribunal can be constituted and one procedure can be run without breaching either of them. Minor differences in wording rarely matter. Differences that cannot be reconciled in a single procedure, such as two different seats or two different methods of appointing the tribunal, usually do. The table below summarises the features counsel should compare before relying on the ICC multi contract claims Article 10 route.

Feature of the clausesUsually compatible whenTypical problem
Institution and rulesAll clauses refer to ICC arbitrationOne clause refers to another institution or to ad hoc rules
SeatSame seat, or only one clause names a seatDifferent seats with different curial laws and supervisory courts
Number of arbitratorsSame number, or one clause is silentSole arbitrator in one contract, three arbitrators in another
Appointment methodICC default mechanism in each clauseBespoke appointment rights or qualifications that conflict
LanguageSame language, or a workable bilingual procedureMandatory different languages with no agreed solution
Procedural opt-outsConsistent approach to emergency and expedited provisionsOne clause opts out of a procedure the other preserves
Pre-arbitral stepsEquivalent negotiation or mediation tiers, or noneUnsatisfied escalation steps under one contract only

Two points deserve emphasis in any ICC multi contract claims Article 10 analysis. First, compatibility is assessed between the arbitration agreements, not between the underlying contracts: different governing laws for the commercial terms do not, by themselves, make the clauses incompatible. Second, a clause that is silent on a feature is generally easier to reconcile than a clause that expressly requires something different. A clause naming London as the seat and another naming no seat can often work together; clauses naming London and Singapore cannot without a fresh agreement.

Compatibility is necessary but not sufficient. Article 7(2)(b) also requires that all parties to the arbitration may have agreed that the claims can be determined together. That consent can be express, for example a clause in a framework agreement stating that disputes under the project documents may be heard in one arbitration. It is more often inferred from the transaction as a whole: the same parties, contracts concluded as part of one economic operation, cross-references between the documents and identical dispute resolution clauses.

The inference weakens when the contracts involve different parties, were concluded years apart for unrelated purposes, or contain deliberately different clauses. Where a claim under a second contract is made against a party that did not sign the first, the question is no longer only one of multiple contracts; it also engages Article 7(2)(a) on whether an arbitration agreement binding all the relevant parties may exist, and possibly joinder under Article 8. Our page on joinder and consolidation covers those overlapping mechanisms.

Under the ICC multi contract claims Article 10 mechanism, the standard at the Court stage is low: the Court asks only whether consent “may” exist. The tribunal later decides the question finally, and a national court may review it in annulment or enforcement proceedings. A party that wins at the prima facie stage therefore still needs a properly reasoned case on consent, because an award that determines claims together without the parties’ agreement may be exposed to challenge at the seat.

Procedure, costs and timing in ICC multi contract claims Article 10 cases

Procedurally, the ICC multi contract claims Article 10 framework rewards early clarity. The claimant should file one Request that lists each contract, attaches each arbitration agreement and identifies which claim is made under which agreement. A respondent that objects should say so in its Answer and explain why the clauses are incompatible or why consent is lacking. Whether the Secretary General refers the plea to the Court is a matter of discretion; if no referral is made, the tribunal decides the issue directly once constituted.

Cost and time consequences follow. Under Article 40(5), the Secretary General may fix separate advances on costs for claims and counterclaims, and Article 40(6) gives similar flexibility for claims made under Articles 8 and 9. After the initial case management conference, Article 25 bars new claims without the tribunal’s authorisation, so a claimant that wants to bring claims under a further contract into the same case should do so at the outset.

The Highly Expedited Arbitration Provisions in Appendix VI take a different line. Article 2 of that Appendix states that the tribunal itself decides any question of jurisdiction or whether all claims may be determined together, without the Court’s prima facie review, and Article 3 excludes joinder and consolidation altogether. Parties who opt into Highly Expedited Arbitration across several contracts should therefore draft their clauses so that a single, compatible procedure is obvious from the documents.

Typical multi-contract scenarios

Multi-contract disputes arise in a handful of recurring settings, and each raises the compatibility and consent questions in a slightly different way.

  • Construction and infrastructure. An EPC contract, a separate offshore supply contract and an onshore services contract are often split for tax or licensing reasons but performed as one project. Clauses are frequently identical, which helps, but the parties to each contract may differ.
  • M&A and joint ventures. A share purchase agreement, a shareholders’ agreement and transitional services agreements are concluded together. Warranty claims and governance disputes overlap, yet the documents are sometimes negotiated by different teams with different clauses.
  • Finance and guarantees. A facility agreement, a parent guarantee and security documents may point to arbitration, courts or both. Asymmetric or optional clauses make compatibility harder to show.
  • Long-term supply and offtake. Framework agreements followed by call-off orders raise the question whether each order is a separate contract with its own clause or a performance step under the framework.

In each setting, the first task is the same: identify every contract on which a claim is based, extract its dispute resolution clause and test the clauses against each other before deciding how to file. Where the documents were signed at different times, check also which version of the ICC Rules each clause selects, because Article 1(2) allows parties to agree on Rules in effect on an earlier date and some features, such as the expedited procedure thresholds, depend on when the arbitration agreement was concluded.

Drafting for multi-contract projects

Most compatibility disputes are avoidable at the drafting stage. In construction, energy, M&A and finance transactions, the contract suite is usually negotiated by the same team, yet dispute resolution clauses drift apart as documents are revised. A short audit before signing removes most of the risk.

  • Use the same ICC clause in every contract, with the same seat, language and number of arbitrators.
  • Add express consent that claims under any of the listed contracts may be determined in a single arbitration and that arbitrations may be consolidated under Article 11.
  • Align multi-tier steps so that negotiation or mediation periods run in parallel across contracts.
  • Treat emergency arbitrator and expedited procedure opt-outs consistently.
  • Where third parties sign only some documents, consider an umbrella agreement signed by all of them.
Practical point

Before filing, put the arbitration clauses from every relevant contract side by side in a single table. If the seat, the number of arbitrators or the appointment method differs, assume that the ICC multi contract claims Article 10 route will be contested and prepare the alternative, separate Requests followed by an Article 11 consolidation application, at the same time.

The ICC model clauses are a sensible starting point, but they address a single contract. Multi-contract wording needs to be added deliberately, and our note on consolidation under Article 11 explains how such wording interacts with the Court’s consolidation powers.

ICC multi contract claims Article 10 strategy for claimants and respondents

For claimants, the attraction of a single arbitration is obvious: one tribunal, one set of hearings, a reduced risk of inconsistent awards and one coordinated timetable. The risk is an early jurisdictional fight that delays the case and, if the claimant loses it, a need to start again. A claimant should therefore weigh how strong the compatibility and consent case really is, and whether limitation periods leave room for a second attempt.

For respondents, the choice is tactical as well as legal. An objection may split the case and increase cost for both sides, and Article 42 deems a party that proceeds without objecting to have waived its right to object to non-compliance with the Rules. A respondent that wants to preserve the point should raise it promptly and specifically.

Illustration: a contractor and an employer sign an engineering agreement and a separate supply agreement for the same plant. Both contain ICC clauses with a Paris seat and three arbitrators, but the supply clause requires the chair to be an engineer. A combined Request is likely to pass the prima facie test, but the tribunal will need to satisfy both appointment requirements, and the parties would be wise to agree how to do so at the outset.

How TRW & Co helps

We advise claimants and respondents on multi-contract ICC disputes from the first review of the contract suite. Our teams in Dhaka, London, Dubai, New York, Singapore and Delhi map the arbitration clauses across project, supply, finance and shareholder documents, assess compatibility and consent under Articles 7 and 10, and decide with clients whether a single Request, parallel Requests or a consolidation strategy best serves their objectives. We prepare and answer jurisdictional pleas before the ICC Court and the tribunal, and we redraft clause suites for new transactions so that future disputes can be heard together. To discuss a specific matter, please contact our international arbitration team.

Frequently asked questions

What does Article 10 of the 2026 ICC Rules allow?

Article 10 allows claims arising out of or in connection with more than one contract to be made in a single ICC arbitration, whether the claims are made under one arbitration agreement or under several. The permission is subject to Articles 7(1) to 7(6). Where claims are made under different arbitration agreements and a party objects, the arbitration proceeds only for claims where the agreements may be compatible and the parties may have agreed to a single arbitration.

Who decides whether claims under several contracts can be heard together?

Usually the arbitral tribunal, which decides directly under Article 7(1). The Secretary General may instead refer the question to the ICC Court before the tribunal is constituted. The Court then applies a prima facie test under Article 7(2)(b). Its decision does not bind the tribunal on the merits or admissibility, and an excluded claim can be reintroduced in other proceedings under Article 7(6).

When are two ICC arbitration clauses incompatible?

The Rules do not define the term. In practice, clauses are treated as incompatible where one tribunal and one procedure cannot satisfy both, for example where they name different seats, require different numbers of arbitrators or set conflicting appointment methods or qualifications. Differences in the governing law of the underlying contracts, or silence in one clause on a point the other addresses, are less likely to be fatal.

Is Article 10 the same as consolidation?

No. Article 10 governs claims under several contracts brought in a single arbitration from the outset. Consolidation under Article 11 merges two or more arbitrations that are already pending. Under Article 11(1)(c), arbitrations under different arbitration agreements can be consolidated where they are between the same parties, arise in connection with the same legal relationship and the Court finds the agreements compatible.

Does Article 10 apply in Highly Expedited Arbitration?

Claims under several contracts can still be brought, but Appendix VI changes the procedure. The sole arbitrator decides directly any question about whether claims may be determined together, without a referral to the Court, and joinder and consolidation are not permitted. Parties opting into Highly Expedited Arbitration for a group of contracts should make sure their clauses are identical.

Sources

  1. ICC 2026 Arbitration Rules and 2014 Mediation Rules, English text (PDF)
  2. ICC Note to Parties and Arbitral Tribunals on the Conduct of ICC Arbitration, 1 June 2026 (PDF)
  3. ICC Arbitration Rules 2021 and 2026 compared version (PDF)
  4. ICC 2026 Arbitration Rules (official page)

General information only, not legal advice. References to the ICC, the ICC Court and the ICC Rules describe their published rules and practice; TRW & Co is independent of the ICC.