Splitting liability from quantum can halve the cost of a losing case, or double the cost of a winning one. This guide to bifurcation in ICC arbitration explains the legal basis under the 2026 Rules, the factors tribunals weigh, the cost and timing consequences of partial awards, and how to make or resist an application.

Key takeaways
- The 2026 Rules contain no bifurcation article; the power comes from Articles 23 and 24.
- The ICC Note supports bifurcation only where it may genuinely make resolution more efficient.
- Separable evidence and real dispositive potential are the strongest arguments for a split.
- Each partial award is scrutinised by the Court under Article 37.
- Early determination under Article 30 is a faster alternative for manifestly unmeritorious points.
Bifurcation in ICC Arbitration: The Short Answer
Splitting a case into phases, typically liability first and quantum later, is a case management tool, not a right. The 2026 ICC Rules contain no article headed "bifurcation"; the power comes from the tribunal's general duty to manage the case efficiently under Article 23 and from the Note to Parties and Arbitral Tribunals, which lists bifurcation, or partial awards on key issues, among recommended techniques "when doing so may genuinely be expected to result in a more efficient resolution of the case". That test is the heart of every decision on bifurcation in ICC arbitration: will the split genuinely save time and cost, or just add a second hearing?

In practice, bifurcation in ICC arbitration works best when liability is genuinely uncertain, quantum is expensive to prove, and the two phases can be tried with different evidence. It works badly when causation and loss are intertwined, when the same witnesses and experts would give evidence twice, or when a liability finding is unlikely to produce settlement. The rest of this guide explains the legal basis, the factors tribunals weigh, and how to argue for or against a split.
Legal Basis in the 2026 Rules and Soft Law
Four provisions of the 2026 ICC Rules work together. Article 23(1) requires the tribunal and the parties to conduct the case expeditiously and cost-effectively, having regard to its complexity and value. Article 23(2) empowers the tribunal, after consulting the parties, to adopt procedural measures, including the case management techniques described in the Secretariat's guidance. Article 24 requires an initial case management conference within 30 days of the tribunal receiving the file, and allows further conferences. And Article 2 defines "award" to include an interim or partial award, so a first-phase decision can take the form of an award subject to Court scrutiny under Article 37.
The Note to Parties reinforces this. Its case management section suggests further conferences after key stages to "discuss benefits of potential bifurcation of any (further) issues". In other words, bifurcation is not a once-only choice at the first conference; it can be revisited as the case develops.
Soft law points the same way. Article 2.3 of the IBA Rules on the Taking of Evidence (2020) encourages the tribunal to identify, as soon as appropriate, issues for which a preliminary determination may be appropriate. The UNCITRAL Arbitration Rules expressly allow separate awards on different issues at different times, and many arbitration laws, including section 47 of the English Arbitration Act 1996, allow awards on different issues unless the parties agree otherwise.
Parties can also agree the structure themselves. An arbitration clause or a later procedural agreement may provide for a separate liability phase, and Article 23(2) requires the tribunal's measures not to be contrary to the parties' agreement. Under the 2026 Rules Terms of Reference are optional, but where the parties and tribunal decide to prepare them the Note to Parties envisages that they include a list of issues, which is a convenient place to record which issues belong to each phase. Such agreements are rare in practice, because few parties can predict at the drafting stage which issues will matter.
Types of Split
"Bifurcation" covers several different structures. Choosing the right one matters as much as deciding whether to split at all.
- Jurisdiction, then merits. The tribunal decides objections to its jurisdiction first. Common where a respondent disputes that it is bound by the arbitration agreement, or that a claim falls within it.
- Liability, then quantum. The classic split. The tribunal decides breach, causation in principle and any defences, and only then hears damages evidence.
- Preliminary issues. A single point of contract interpretation, a limitation defence or a liability cap is decided early because it may dispose of most of the claim.
- Trifurcation. Jurisdiction, liability and quantum each in separate phases. Rare in commercial cases because of the delay.
For manifestly unmeritorious claims or defences, the 2026 Rules now offer a different tool: early determination under Article 30, which allows a tribunal, in its discretion, to dispose of claims or defences that are manifestly without merit or manifestly outside its jurisdiction. Early determination is narrower and faster than bifurcation; see our page on early determination of claims.
Jurisdictional Objections: A Special Case
Jurisdictional objections follow a two-stage path in ICC arbitration. Under Article 7(1) of the 2026 Rules, the tribunal decides jurisdiction directly unless the Secretary General refers the matter to the Court before the tribunal is constituted. If referred, the Court decides only whether it is prima facie satisfied that an ICC arbitration agreement may exist (Article 7(2)); that decision is without prejudice to the tribunal's final ruling (Article 7(3)). Article 7(4) then confirms the tribunal's authority to decide its own jurisdiction. Our page on prima facie jurisdiction explains the Court's role.
Once constituted, the tribunal must choose between deciding jurisdiction as a preliminary question and joining it to the merits. Respondents often press for a preliminary hearing because a successful objection ends the case without any merits costs. Claimants often resist, arguing that the jurisdictional facts (who negotiated the contract, which group entity performed it) overlap with the merits evidence.
Tribunals tend to favour a separate jurisdictional phase where the objection is substantial, can be decided on a limited record, and would dispose of the whole case or of a separable party or claim. They tend to join jurisdiction to the merits where the objection is weak, where the same witnesses would be needed twice, or where it concerns only part of the claims. Where non-signatory or group-of-companies arguments are involved, the overlap with the merits is often significant.
The status of first-phase findings
Whatever the split, the phase-one decision should state clearly which issues it decides finally. A partial award is generally final and binding on the matters it decides, so the tribunal cannot revisit them in phase two, and the parties cannot re-argue them. Findings made only as part of the reasoning, rather than in the operative part, can be more contentious. Ask the tribunal at the outset to confirm how phase-one findings will be treated, and whether phase one will produce a partial award or a procedural decision that remains open until the final award.
Factors Tribunals Weigh
When deciding on bifurcation in ICC arbitration, tribunals usually start from the presumption of a single phase and ask the requesting party to show that a split will be more efficient overall. The table summarises the factors most often argued.
| Factor | Points towards bifurcation | Points against bifurcation |
|---|---|---|
| Dispositive potential | A liability or jurisdiction finding for the respondent would end the case | Even a respondent win on the first phase leaves major claims standing |
| Separability of evidence | Liability turns on documents and fact witnesses; quantum on accounting or valuation experts | Causation and loss are intertwined, as in many delay and disruption claims |
| Cost of quantum | Quantum requires expensive expert work, site analysis or forensic accounting | Quantum is a simple calculation or a liquidated sum |
| Settlement prospects | A liability ruling is likely to prompt negotiation | The parties will fight quantum regardless |
| Timing and duplication | Two shorter hearings are manageable | Witnesses and experts would appear twice and total duration would increase |
| Recourse risk | A partial award can be scrutinised and, if needed, challenged early | A partial award invites early set-aside proceedings that delay phase two |
Sequencing can sometimes capture the benefit of a split without a second hearing. A tribunal may order liability submissions and expert reports first, with quantum reports to follow, but hear everything together; or it may decide a single preliminary issue on the papers. These hybrids are worth proposing when a full split is unlikely to be granted.
None of these factors is decisive alone, and the case law on bifurcation in ICC arbitration is largely unpublished, so arguments rest on efficiency rather than precedent. A tribunal is weighing probabilities: if the chance of the first phase disposing of the case is modest, the expected saving may be smaller than the certain extra cost of two phases.
Costs, Time Limits and Partial Awards
Bifurcation in ICC arbitration affects costs in ways parties sometimes overlook. The Note to Parties gives guidance milestones for arbitrators' fees and ICC administrative expenses. As a matter of guidance only, the Court may fix the arbitrators' fees at the minimum of the scale once a partial award has been issued or a major hearing held, and at between 50% of the average and the average where multiple partial awards have been made. ICC administrative expenses may be fixed at 75% once partial awards or other major procedural milestones are completed. Splitting the case therefore moves costs forward but does not normally reduce the total fee scale.
Advances on costs are fixed by reference to the whole dispute, not the phase, so a split does not reduce what must be paid up front. Parties funding the case through a third-party funder or a budget approved by a board should model both outcomes: a short case if phase one ends the dispute, and a longer, somewhat costlier one if it does not.
Time matters too. The Note expects sole arbitrators to submit draft awards within two months, and three-member tribunals within three months, of the last substantive hearing or last written submissions on the matters to be decided in the award, with fee reductions for unjustified delay, and the Court may take into account delays in submitting partial awards. Each partial award must go through scrutiny under Article 37 before it is signed. Build both stages into the timetable; our guide to a realistic ICC procedural timetable shows how.
A partial award on jurisdiction or liability may also be open to immediate challenge at the seat. Under Article 16(3) of the UNCITRAL Model Law, if a tribunal rules as a preliminary question that it has jurisdiction, any party may ask the court to decide the matter within 30 days. In England, a jurisdictional award can be challenged under section 67 of the 1996 Act; see our note on section 67 challenges after the 2025 reforms. Parties should plan for the possibility that phase two runs in parallel with court proceedings on phase one.
Before applying for bifurcation, define the phase-one issues in writing with the same precision as a list of issues. Most disputes about bifurcation in ICC arbitration are really disputes about where causation sits. If "liability" includes proof that the breach caused some loss, say so; if causation of each head of loss is left to phase two, say that instead. A vague split produces arguments at the quantum hearing about matters both sides thought were already decided.
Making or Resisting an Application for Bifurcation in ICC Arbitration
The application is normally made at or before the initial case management conference, so that the procedural timetable reflects the structure. Raising it after the first round of memorials is possible but harder, because some of the expected saving has already been lost. For the drafting of the resulting order, see our guide to Procedural Order No. 1 and our page on the case management conference.
For the applicant
- Show the tribunal a realistic comparison of the two timetables, single phase and split.
- Identify which witnesses and experts belong to each phase, and why there is little overlap.
- Explain why a first-phase ruling would be likely to dispose of, or substantially narrow, the case.
- Propose a tight timetable for phase two so the split does not look like a delaying tactic.
- Offer to exchange quantum expert reports on a fixed timetable after the liability decision, so the tribunal can see the end date.
For the opponent
- Map the factual overlap between liability and quantum, especially causation, mitigation and contributory fault.
- Point to the cost of a second hearing, second round of submissions and second scrutiny.
- Offer alternatives: issue-by-issue scheduling, sequential expert reports, or early determination of a narrow point under Article 30.
- Highlight any interim relief or security issues that would be prolonged by a longer overall timetable.
- If the split is ordered, insist on a clear definition of phase-one issues and of the status of any findings for phase two.
Illustration (hypothetical): In a post-closing M&A dispute, the buyer claims under several warranties and the seller relies on a notice provision that, if valid, would bar most claims. The notice point turns on documents and two witnesses, while quantum would require competing valuation reports. A tribunal might well decide the notice issue first. By contrast, in a construction delay claim where the same programming experts address both responsibility for delay and its cost, the case for a split is much weaker. For quantum evidence in general, see our note on quantum experts.
How TRW & Co Helps
We advise claimants and respondents on procedural strategy from the request for arbitration onwards. Our teams in Dhaka, London, Dubai, New York, Singapore and Delhi assess whether a split would genuinely save time and cost, prepare comparative timetables and evidence maps for the case management conference, and draft applications for, or objections to, bifurcation, preliminary issues and early determination.
Where a partial award is issued, we advise on its effect for the next phase and on any recourse at the seat. To discuss how bifurcation in ICC arbitration could work in your dispute, contact our team.
Frequently asked questions
Can an ICC tribunal bifurcate without the parties' agreement?
Yes. Under Article 23(2) of the 2026 Rules the tribunal may, after consulting the parties, adopt the procedural measures it considers appropriate, provided they are not contrary to the parties' agreement. Bifurcation is one such measure. If the parties have agreed a single-phase procedure, for example in their arbitration clause, the tribunal should respect that agreement.
When should a bifurcation request be made?
Ideally at or before the initial case management conference, which must take place within 30 days of the tribunal receiving the file under Article 24. That allows the timetable to be built around the split. Requests made later are possible, and the Note to Parties contemplates revisiting bifurcation at further conferences, but the expected saving usually falls as the case progresses.
Is a decision on liability an award?
It can be. Article 2 of the 2026 Rules defines "award" to include an interim or partial award. A partial award on liability or jurisdiction must be submitted to the ICC Court for scrutiny under Article 37 before signature, and depending on the seat it may be open to challenge in court straight away.
Does bifurcation reduce ICC fees?
Not necessarily. ICC fees are based on the amount in dispute and the work done. The Note to Parties gives guidance milestones under which fees may be fixed at the minimum of the scale once a partial award is issued. If the first phase ends the case, total costs are usually lower; if it does not, the second phase adds cost.
What is the difference between bifurcation and early determination?
Bifurcation divides the whole case into phases with full evidence on each. Early determination under Article 30 of the 2026 Rules is a targeted procedure for claims or defences that are manifestly without merit or manifestly outside jurisdiction. It is narrower and faster, and the tribunal decides in its discretion whether to let the application proceed.
Sources
- ICC 2026 Arbitration Rules (official page and text)
- ICC Note to Parties and Arbitral Tribunals on the Conduct of ICC Arbitration (1 June 2026)
- IBA Rules on the Taking of Evidence in International Arbitration (2020)
- UNCITRAL Model Law on International Commercial Arbitration (1985, as amended 2006)
- UNCITRAL Arbitration Rules
General information only, not legal advice. References to the ICC, the ICC Court and the ICC Rules describe their published rules and practice; TRW & Co is independent of the ICC.