Cross-Border Energy Disputes in South Asia

South Asia cross border energy disputes are growing as Nepal exports hydropower to India and Bangladesh and Bangladesh imports from Indian plants. We explain the treaties and grid rules behind the trade, where disputes arise, how regulatory change shifts risk and how ICC arbitration and enforcement planning protect commercial parties.

High-voltage transmission towers linking national grids, illustrating south asia cross border energy disputes

Key takeaways

  • The 2014 Nepal-India power trade agreement resolves differences only by consultation between governments.
  • Enforceable rights sit in commercial contracts between utilities, traders and generators.
  • Nepal began supplying 40 MW to Bangladesh through the Indian grid in November 2024.
  • India amended its cross-border guidelines in August 2024 to allow domestic sales by export plants.
  • ICC joinder, consolidation and direct appointment tools suit multi-party utility contract chains.

South Asia cross border energy disputes: the short answer

South Asia cross border energy disputes arise from a fast-growing but thinly regulated trade in electricity between Nepal, India, Bhutan and Bangladesh. The trade rests on government-to-government agreements that resolve differences only by consultation, Indian regulatory guidelines that can change by executive memorandum, and commercial contracts between state utilities, traders and generators. Those commercial contracts are where enforceable rights sit, so their dispute clauses, often providing for arbitration, decide how payment, curtailment and change-in-law disputes are resolved.

High-voltage transmission towers linking national grids, illustrating south asia cross border energy disputes
South Asia cross border energy disputes span treaties, Indian grid rules and utility contracts across Nepal, India and Bangladesh.

The scale of ambition is significant. Nepal and India signed a memorandum of understanding in January 2024 setting a target of 10,000 MW of electricity exports from Nepal to India over ten years, and in November 2024 Nepal began selling power to Bangladesh through the Indian grid under a tripartite contract. Bangladesh also imports electricity from India, including from a plant built to supply it. Each of these flows depends on contracts that cross at least two legal systems.

This insight maps the legal architecture, the disputes that recur, the regulatory risks and the ICC tools that suit them. It is general information as at November 2026, not legal advice.

At the top sits the Agreement between Nepal and India on Electric Power Trade, Cross-Border Transmission Interconnection and Grid Connectivity, signed in Kathmandu on 21 October 2014. Article IV(b) allows authorised or licensed producers, buyers and traders of each country to engage in cross-border electricity trade, including through power exchanges, subject to national laws. Article VIII provides for a 25-year term with automatic ten-year renewals. Article VII, however, provides only that differences in interpretation and implementation are settled by mutual consultation between the two governments. Private parties derive no arbitration right from it.

Regionally, SAARC member states signed a Framework Agreement for Energy Cooperation (Electricity) in 2014, which encourages cross-border trade but likewise operates between states. In practice the operative rules are national. India, whose grid connects every other participant, regulates cross-border transactions through the Ministry of Power's Guidelines for Import/Export (Cross Border) of Electricity 2018 and a procedure administered by the Central Electricity Authority as designated authority.

The commercial layer

Commercial flows depend on contracts between utilities and traders. The tripartite arrangement signed in Kathmandu on 3 October 2024 by the Nepal Electricity Authority, the Bangladesh Power Development Board and NTPC Vidyut Vyapar Nigam provides for 40 MW to flow from Nepal to Bangladesh between mid-June and mid-November each year, transmitted through the 400 kV Dhalkebar-Muzaffarpur line into India, with India delivering the equivalent energy to Bangladesh. Bilateral power purchase agreements, transmission service agreements and trading licences complete the picture. Our insight on arbitration in Nepal explains the domestic law on the Nepali side.

Where South Asia cross border energy disputes arise

The recurring categories of South Asia cross border energy disputes are predictable, even if each project is different:

  • Payment arrears. State buyers facing foreign exchange shortages or fiscal pressure fall behind on dollar-denominated invoices, triggering late payment charges, suspension rights and termination threats.
  • Tariff and fuel pass-through. Disputes over how coal, gas or exchange-rate costs are passed through, and over tariff reviews demanded by a new government.
  • Scheduling and curtailment. Claims where power is not scheduled, deemed generation is disputed or a transmission constraint prevents delivery.
  • Transmission availability. Delays in cross-border lines and substations that leave generation stranded.
  • Change in law and regulatory approvals. Amendments to export guidelines, revocation of approvals or repeal of special procurement laws.
  • Hydrology and force majeure. Floods, landslides and dry-season shortfalls affecting run-of-river output and contractual minimums.
Contract layerTypical partiesUsual dispute mechanismMain risk
Government-to-government agreementMinistries of Nepal and India, or other statesMutual consultation (for example Article VII of the 2014 Nepal-India agreement)No private enforcement route
Cross-border power purchase or sale agreementGenerator or utility and foreign utility or traderNegotiated; commonly arbitration, sometimes at a neutral seatPayment, tariff, curtailment
Tripartite or trading arrangementSeller utility, Indian trader, buyer utilityAs negotiated between the three partiesAllocation of transmission and scheduling risk
Transmission service agreementGrid operators and line ownersDomestic regulatory or contractual routeDelay and availability
EPC and financing agreementsContractors, lenders, sponsorsICC or other institutional arbitration; courts for loan enforcementDelay, cost overrun, security enforcement

Change in law and regulatory risk

Regulatory change is the distinctive risk in South Asia cross border energy disputes, because a single executive decision in one country can alter the economics of a contract in another. In August 2024 India's Ministry of Power amended the cross-border guidelines by an office memorandum dated 12 August 2024. As reported at the time, the amendment allows a generating station built to supply a neighbouring country to connect to the Indian grid and sell power in India in cases of sustained non-scheduling or payment default under its power purchase agreement. The Central Electricity Authority amended its procedure on 14 August 2024 to permit such grid connection where the Government of India allows it under the guidelines.

The change was widely reported as relevant to a coal-fired plant in eastern India dedicated to supplying Bangladesh, where payment arrears had accumulated. In Bangladesh, the special power and energy procurement law of 2010 was repealed by ordinance in late November 2024, and power purchase contracts concluded under it have been subject to review. Both developments illustrate how quickly the regulatory ground can move under a long-term contract.

Practical point

Draft change-in-law, approvals and payment security clauses for both jurisdictions, not just the buyer's. In these disputes, a tribunal will look first at how the contract allocated the risk of a regulatory change in the seller's or transit country, and only then at general doctrines such as force majeure or hardship.

Structuring dispute resolution for South Asia cross border energy disputes

Because the governmental layer offers only consultation, the commercial contracts must carry the enforcement load. ICC arbitration under the 2026 Rules offers several tools that fit multi-party energy chains. Articles 8 to 10 allow joinder and claims arising under multiple contracts, and Article 11 permits consolidation in defined circumstances, which helps where a seller, a trader and a buyer each hold related contracts. Our page on joinder and consolidation explains the conditions.

State utilities are usually the counterparties. Under Article 14(4) of the 2026 Rules the ICC Court may appoint arbitrators directly where a party is a state or may be considered a state entity. Urgent relief, such as restraining termination or a call on payment security, can be sought from an emergency arbitrator under Article 31 and Appendix IV for contract-based claims; the emergency arbitrator provisions do not apply where the arbitration agreement arises from a treaty or an investment protection law. Where foreign investors hold equity in generation assets, investment treaty protection may also be relevant and should be assessed when the investment is structured.

Seat selection deserves care. A neutral seat such as Singapore or London is common where the parties come from different South Asian states, but it should be checked against enforcement needs in each country where the buyer holds assets. Our insights on power project disputes in South Asia and power sector disputes in Bangladesh discuss state-buyer defences, and our energy sector page covers wider practice.

Illustration, evidence and quantum

Illustration: a hypothetical run-of-river generator in Nepal sells part of its wet-season output to a Bangladeshi buyer through an Indian trader under back-to-back contracts. Midway through the season, a grid constraint in India reduces the scheduled flow, the buyer withholds payment for energy it says was not delivered, and the trader claims it is only liable to pay what it receives. The generator's contract with the trader provides for ICC arbitration in Singapore; the trader's contract with the buyer provides for arbitration in Dhaka. Each party has a plausible case, but the inconsistent clauses risk two proceedings, two tribunals and contradictory findings on the same metering data.

The lesson of the illustration is structural. Back-to-back contracts should use compatible arbitration clauses, the same rules and the same seat, so that the ICC multi-contract and consolidation provisions can operate, and they should allocate the risk of transit-country constraints expressly.

Evidence in these disputes is technical and data-heavy. Metering records at the interconnection point, scheduling instructions from load dispatch centres, outage logs, hydrological data and invoices form the backbone of any claim. Parties should agree, in the contract, which meter is authoritative, how discrepancies are reconciled and how long data must be retained. Where records are held by a grid operator in a third country, the contract should oblige the counterparty to obtain and share them.

Quantum questions follow. Claims for deemed generation or capacity charges depend on how availability is defined; claims for lost sales depend on market prices on Indian power exchanges or alternative buyers; and late payment claims depend on contractual interest rates and currency of account. Experts in power markets, hydrology and accounting are usually needed, and their instructions should be framed around the contract's own formulae rather than abstract economic theory.

Currency and payment security

Cross-border power contracts in the region are usually priced in US dollars or Indian rupees, while buyers earn revenue in local currency. When foreign exchange becomes scarce, payment delays follow even where the buyer does not dispute the debt. Letters of credit, escrow accounts, payment security mechanisms backed by the buyer's government and step-in rights for lenders are the main protections. A tribunal can award interest and costs, but it cannot create foreign exchange, so these mechanisms often decide the real outcome.

Parties should also consider the interaction with central bank rules. Remitting an award amount abroad may require approval in the debtor's jurisdiction, and a clause stating that the payer bears the risk of convertibility and transfer restrictions strengthens the creditor's position. Our insight on force majeure and hardship claims discusses how tribunals treat currency shortages and government measures raised as excuses for non-payment.

Enforcing awards across South Asia

All five principal South Asian jurisdictions involved in regional energy trade or investment are parties to the New York Convention, according to the UNCITRAL status table: India since 1960, Sri Lanka since 1962, Bangladesh since 1992, Nepal since 1998 and Pakistan since 2005. The procedures differ markedly. Nepal requires an enforcement application within 90 days from the date of the award; India applies the Convention only to awards made in territories it has notified as reciprocating; and enforcement against state utilities raises questions of immunity, budget approval and foreign exchange.

Creditors in South Asia cross border energy disputes should therefore plan enforcement when the contract is signed: identify where the buyer holds commercial assets, obtain waivers of immunity from execution, require letters of credit or escrow arrangements, and keep the documentation needed for recognition proceedings in each likely forum.

Enforcement outside the region can also matter. State utilities and traders may hold receivables, bank balances or shareholdings in Singapore, the United Kingdom or the Gulf, and awards can be enforced there under the same Convention. Where the debtor is a state entity, the creditor must distinguish commercial assets from those protected by immunity, and should expect arguments about whether the entity is separate from the state. Our page on enforcing awards against states and state entities explains the principles that apply in leading jurisdictions.

How TRW & Co helps

We advise generators, utilities, traders, lenders and investors on dispute resolution and risk allocation in cross-border power contracts involving Nepal, India, Bangladesh and the wider region. Our teams in Dhaka, Delhi, London, Singapore, Dubai and New York act for claimants and respondents in ICC arbitrations concerning payment, tariff, curtailment and change-in-law claims, and coordinate with local counsel on interim relief and enforcement against state-owned buyers. We help clients align dispute clauses across power purchase, trading, transmission and EPC contracts so that related claims can be heard together. To discuss a project or a dispute, please contact us.

Frequently asked questions

Can private parties rely on the 2014 Nepal-India power trade agreement in arbitration?

Generally not. The 2014 agreement is between the two governments, and Article VII settles differences on interpretation and implementation through mutual consultation between them. Private generators, traders and utilities must rely on their own commercial contracts, such as power purchase and trading agreements, for enforceable dispute resolution rights, including arbitration.

How does electricity from Nepal reach Bangladesh?

Under the tripartite arrangement signed on 3 October 2024 by the Nepal Electricity Authority, the Bangladesh Power Development Board and NTPC Vidyut Vyapar Nigam, Nepal delivers 40 MW into India through the Dhalkebar-Muzaffarpur line between mid-June and mid-November, and India supplies the equivalent energy to Bangladesh. Supply began in November 2024.

What did India change in its cross-border electricity guidelines in 2024?

In August 2024 the Ministry of Power amended its 2018 guidelines so that a generating station built to supply a neighbouring country may connect to the Indian grid and sell power in India in cases of sustained non-scheduling or payment default under its power purchase agreement. The Central Electricity Authority amended its procedure on 14 August 2024 to match.

Is ICC arbitration suitable for cross-border power disputes in South Asia?

Often, yes. The 2026 ICC Rules allow joinder, claims under multiple contracts and consolidation, which suit chains of seller, trader and buyer contracts. The ICC Court can appoint arbitrators directly where a state entity is involved, and emergency arbitrator relief is available for contract-based claims. Enforcement planning against state buyers remains essential.

Are awards enforceable in all the countries involved?

India, Sri Lanka, Bangladesh, Nepal and Pakistan are parties to the New York Convention, but procedures differ. Nepal imposes a 90-day filing limit, India applies the Convention only to awards from notified reciprocating territories, and state utilities may raise immunity or approval defences. Creditors should plan for these issues when drafting the contract.

Sources

  1. Agreement between Nepal and India on Electric Power Trade, Cross-Border Transmission Interconnection and Grid Connectivity (21 October 2014)
  2. Central Electricity Authority: Amendment-II to the Procedure for Import/Export (Cross Border) of Electricity (August 2024)
  3. UNCITRAL: Status of the New York Convention 1958
  4. UNCITRAL: Convention on the Recognition and Enforcement of Foreign Arbitral Awards
  5. ICC 2026 Arbitration Rules

General information only, not legal advice. References to the ICC, the ICC Court and the ICC Rules describe their published rules and practice; TRW & Co is independent of the ICC.