Guide · Sectors
Shipping, Trade and Commodities Disputes in ICC Arbitration
Shipping and commodities disputes are mostly resolved under LMAA and trade association rules, but ICC arbitration is a strong choice for shipbuilding, offtake, minerals and multi-contract trades. This guide compares ICC with LMAA and Gafta, and explains refund guarantees, commodity sale issues, security and the 2026 Rules fast-track options.
Key takeaways
- ICC is common for shipbuilding, offtake and minerals contracts; LMAA dominates charterparties.
- Transportation was 5.5% and general trade 3.4% of new ICC cases in 2025.
- Article 38(3) waiver of recourse is generally understood to exclude section 69 appeals in London.
- Article 11 consolidation is limited, so commodity strings can lead to separate ICC cases.
- Ship arrest and freezing relief remain court remedies and do not waive the ICC clause.
When ICC arbitration is chosen for shipping and commodities disputes
Most charterparty disputes go to London Maritime Arbitrators Association (LMAA) arbitration, and much of the soft commodities trade uses the trade association systems of Gafta and FOSFA. ICC arbitration occupies a different part of the shipping and commodities market. It is commonly chosen for shipbuilding and offshore construction contracts, long-term supply and offtake agreements, trading of metals, minerals and energy commodities, logistics and port concessions, and disputes where the parties want an administering institution, a seat outside London, or a single forum for a group of linked contracts. The 2026 ICC Rules apply to arbitrations commenced on or after 1 June 2026 unless otherwise agreed.

The ICC's statistics for 2025 give a sense of scale: transportation accounted for 5.5% of the 881 new cases filed under the Arbitration Rules, and general trade and distribution for 3.4%. Many energy and construction cases also involve commodities or vessels. The ICC is therefore not the dominant forum for everyday maritime claims, but it is a significant one for higher-value, multi-contract and cross-border shipping and commodities matters.
Choosing between ICC and the specialist systems is a commercial decision. Speed, cost, the expertise of the decision-makers, the availability of appeals and the treatment of string contracts all differ. The sections below compare the options, then look at shipbuilding, commodity sales, interim relief and drafting.
ICC, LMAA and Gafta compared for shipping and commodities
| Feature | ICC arbitration | LMAA arbitration | Gafta arbitration |
|---|---|---|---|
| Administration | Fully administered by the ICC Court and Secretariat, including scrutiny of draft awards | Largely party-driven under the LMAA Terms, with limited administration | Administered by the trade association under its own rules |
| Current rules | 2026 ICC Rules | LMAA Terms 2021, with Small Claims and Intermediate Claims Procedures | Arbitration Rules No. 125 and Expedited Arbitration Procedure Rules No. 126 (versions effective 1 July 2026) |
| Seat | Chosen by the parties, or fixed by the Court | London in practice | Under the Gafta rules and contract forms |
| Decision-makers | Chosen by the parties and confirmed by the Court, or appointed by the Court | Maritime specialists, often LMAA members | Gafta Qualified Arbitrators with at least ten years in the grain and feed trade |
| Internal appeal | None; scrutiny precedes the award | None internally; court appeals on law possible unless excluded | Two-stage system with an appeal to a board |
| Typical contracts | Shipbuilding, offshore, offtake, minerals, logistics, multi-party deals | Charterparties, ship sale, bills of lading, many shipbuilding contracts | Gafta standard grain and feed contracts |
One feature deserves emphasis for London-seated cases. Under section 69 of the Arbitration Act 1996, a party may appeal to the court on a question of English law unless the parties have agreed otherwise. Article 38(3) of the 2026 ICC Rules provides that parties are deemed to have waived any form of recourse insofar as such waiver can validly be made, and an ICC clause is generally understood as an agreement excluding section 69 appeals. Parties who value the possibility of a point-of-law appeal, as some shipping parties do, need to consider that before choosing ICC.
Costs are structured differently too. ICC administrative expenses and arbitrator fees are fixed by the Court on scales tied to the amount in dispute, with advances payable up front, whereas LMAA and trade association arbitrators typically charge on the basis set by their own terms. For small claims, the specialist systems are often cheaper; for complex, high-value matters the difference narrows and other factors usually dominate.
Gafta's own guidance describes a two-stage arbitration system and requires its qualified arbitrators to have been actively engaged in the trade for at least ten years, according to the Gafta arbitration pages. That trade expertise is the main attraction of commodity association arbitration. ICC tribunals can include commodities specialists, but parties have to choose them.
Shipbuilding and offshore construction
Shipbuilding contracts are long-term construction projects with a vessel at the end. Disputes usually concern delay, changes and extras, performance shortfalls in speed, deadweight or fuel consumption, defects found during sea trials or the guarantee period, and the buyer's right to rescind and recover instalments. Many contracts follow standard industry forms with heavy amendment. Liquidated damages regimes, permissible delay provisions and rescission thresholds are central to most claims. Our note on shipbuilding arbitration covers those mechanics in more detail.
Refund guarantees are the financial backbone of these contracts. A bank guarantees repayment of pre-delivery instalments if the contract is rescinded or terminated. Disputes over the refund guarantee are often brought against the bank, which is not a party to the shipbuilding contract and may have agreed a different forum.
Under the 2026 Rules, claims under several contracts can be brought in a single arbitration under Article 10, and additional parties can be joined under Article 8, but only where the ICC Court is prima facie satisfied that an arbitration agreement binding the relevant parties may exist. Aligning dispute clauses in the shipbuilding contract and refund guarantee is therefore important. Our banking and finance page discusses guarantee disputes from the bank's perspective.
Illustration (hypothetical): a yard delivers a product tanker four months late and below the guaranteed speed. The buyer claims liquidated damages for delay and performance shortfall, while the yard argues that buyer-requested modifications and late supply of owner-furnished equipment caused the delay. The contract gives the buyer a right to rescind once delay exceeds a stated number of days, and the parties dispute how permissible delay days are counted. The tribunal will need delay analysis, sea trial data and a careful reading of the permissible delay and notice provisions before it can decide whether rescission was available.
Offshore construction, such as floating production units, drilling rigs and offshore wind installation vessels, combines shipbuilding with energy project complexity. Contracts are often based on engineering, procurement and construction models, with multiple subcontractors and equipment suppliers. Delay and disruption analysis, technical experts and multi-party procedures are typical. The ICC's experience in construction cases, which accounted for 28% of new filings in 2025, is relevant to these projects.
Technical evidence dominates. The tribunal may hear party-appointed naval architects and marine engineers, and may appoint its own expert after consulting the parties under Article 26(3). Site inspections of a vessel under construction or in service are sometimes useful, and tribunals increasingly accept virtual inspections where travel is impractical.
Commodity sale and supply disputes
Commodity disputes in ICC arbitration commonly involve metals and minerals, fertilisers, energy products, coal and sometimes agricultural products traded outside the standard association forms. Recurring issues include:
- Quality and quantity. Contracts often make inspection certificates at loading or discharge final and binding, subject to fraud or manifest error. Disputes turn on whether the certificate complied with the contract and who appointed the inspector.
- Delivery terms. Contracts usually incorporate ICC Incoterms rules, which allocate costs, risk and delivery obligations between seller and buyer. Incoterms rules do not deal with transfer of title, price or remedies for breach, so those issues depend on the contract and its governing law.
- Payment. Documentary credits governed by UCP 600, and demand guarantees governed by URDG 758, are common. Discrepancy disputes may go to the bank and the courts rather than the arbitration.
- Demurrage and laytime. Sale contracts often pass through charterparty demurrage. Where the charterparty goes to LMAA and the sale contract to ICC, related claims may be heard in different forums.
- Force majeure, sanctions and export bans. Supply interruptions, export restrictions and sanctions frequently prompt force majeure notices and termination disputes.
Back-to-back and string contracts create a particular difficulty. Commodity association rules are designed for chains of identical contracts; ICC arbitration is not. Under Article 11 of the 2026 Rules, the ICC Court can consolidate arbitrations only where the parties agree, where all claims are made under the same arbitration agreement or agreements, or where the arbitrations are between the same parties, arise from the same legal relationship and involve compatible arbitration agreements.
A trader in the middle of a chain may therefore face separate ICC cases upstream and downstream, with a risk of inconsistent outcomes. Our note on commodities trade disputes in ICC arbitration discusses ways to manage that risk.
Charterparty-adjacent contracts
Although charterparties themselves usually go to LMAA arbitration, ICC tribunals often see shipping questions embedded in other contracts. Long-term supply agreements may include a contract of affreightment, a liquefied gas project may charter a floating storage and regasification unit under terms negotiated alongside the gas sales agreement, and a mining offtake may allocate freight risk through shipping provisions in the sale contract.
In those cases the ICC tribunal must apply maritime concepts such as laytime, demurrage, safe port warranties and off-hire, sometimes by reference to standard charterparty forms incorporated into the contract. Nominating at least one arbitrator familiar with shipping practice is often worthwhile. Where the incorporated form has an established body of English case law, the parties should also consider whether the governing law of the sale contract is consistent with it.
Evidence in trading disputes
Commodity disputes are increasingly fought on electronic records: trading platform messages, instant messaging chats between traders, electronic bills of lading, inspection data and vessel tracking information. Establishing who agreed what, and when, may depend on chat logs that were never meant as contractual documents. Early preservation of devices and messaging accounts, clear protocols for producing chat data, and attention to data protection rules when records sit in several jurisdictions all reduce later disputes about authenticity and completeness.
Sanctions and compliance
Trade sanctions and export controls affect shipping and commodities more directly than almost any other sector. Cargoes may become unsaleable, vessels may be designated, and payment channels may close mid-voyage. Disputes often turn on whether sanctions excuse performance under the contract's sanctions or force majeure clauses, and whether a tribunal can make an award that a party can lawfully perform. Our note on sanctions compliance in ICC arbitration sets out the procedural consequences.
Interim relief: cargoes, vessels and security
Security is often the first battle in shipping and commodities disputes. Ship arrest in admiralty courts, freezing injunctions and attachment of cargoes or receivables are court remedies, not arbitral ones. Article 29(2) of the 2026 Rules confirms that applying to a competent judicial authority for interim or conservatory measures does not infringe or waive the arbitration agreement, although any such application must be notified without delay to the Secretariat and the tribunal.
Within the ICC framework, a party that needs urgent measures before the tribunal is constituted may apply to an emergency arbitrator under Article 31 and Appendix IV, unless the clause opts out or the agreement was concluded before 1 January 2012. Once the tribunal receives the file, it may order interim or conservatory measures under Article 29(1), including orders to preserve cargo or to provide security, and may require the requesting party to provide security in turn. Emergency arbitrator and tribunal orders bind the parties, but they may not be enforceable against third parties such as port authorities or carriers. See our page on asset preservation and attachment.
Illustration (hypothetical): a buyer under a long-term iron ore offtake agreement discovers that the seller is about to sell contracted tonnage to a third party while a dispute about price indexation is pending. The buyer applies for emergency measures requiring the seller to continue allocating tonnage under the agreement pending the tribunal's constitution, while separately seeking a freezing order from the court at the seller's place of incorporation. The two applications serve different purposes and must be coordinated, including on what each says about the other.
Enforcement deserves early thought. Vessels are frequently owned by single-ship companies, and trading counterparties may hold few fixed assets. Receivables from cargo sales, bank accounts used for trade finance and sister vessels in common ownership can be practical targets, subject to the law where they are located. An ICC award is enforceable under the New York Convention in most trading jurisdictions, but recognition proceedings still take time, which is why pre-award security matters so much in this sector.
Speed and proportionality for shipping and commodities claims
Shipping and commodities users are cost-sensitive, and many claims are modest. The 2026 Rules offer several routes to a proportionate procedure.
- Expedited procedure. For arbitration agreements concluded on or after 1 June 2026, Appendix V applies automatically where the amount in dispute does not exceed US$4 million, unless the parties opt out. The thresholds are US$3 million for agreements concluded from 1 January 2021 to before 1 June 2026 and US$2 million for agreements concluded from 1 March 2017 to before 1 January 2021. The award is due within six months of the case management conference, subject to extension.
- Highly Expedited Arbitration. Under Appendix VI, which applies only if all parties agree, a sole arbitrator holds the case management conference within seven days of receiving the file and must render the award within three months of it, subject to extension.
- Documents-only decisions. In both expedited tracks, the tribunal may, after consulting the parties, decide the dispute on the documents alone, without a hearing. Even under the standard Rules, Article 26(5) allows a documents-only decision unless a party requests a hearing.
- Early determination. Article 30 allows manifestly unmeritorious claims or defences to be disposed of early, at the tribunal's discretion.
For a portfolio of sale or supply contracts, decide deliberately how small claims will be resolved. Keeping the automatic expedited procedure and opting into Highly Expedited Arbitration for claims below a stated amount can deliver speed close to the trade association systems, while preserving ICC administration and scrutiny for larger disputes.
Drafting shipping and commodities clauses
- Pick one system per transaction chain where possible. If the charterparty uses LMAA and the sale contract uses ICC, consider whether related disputes can be aligned.
- Coordinate guarantees. Make refund guarantees and payment guarantees consistent with the underlying contract's dispute clause, or at least compatible with it.
- State the seat and law expressly. Include an express choice of law for the arbitration agreement. Our seat, law and language guide explains why.
- Decide on appeals. If you want a section 69 appeal on points of English law, say so expressly and check how that interacts with the ICC waiver.
- Preserve court security. Confirm that ship arrest and attachment remain available.
- Calibrate expedited procedures. Use the Appendix V and Appendix VI options deliberately.
How TRW & Co helps with shipping and commodities disputes
We advise shipowners, yards, buyers, traders, producers, financiers and logistics operators on shipping and commodities disputes under ICC Rules and alongside LMAA, Gafta and court proceedings. That includes choosing and drafting dispute clauses, responding to rescission and refund guarantee disputes, securing claims through arrest, attachment or emergency relief, and enforcing awards where assets are located.
Our teams in Dhaka, London, Dubai, New York, Singapore and Delhi follow trade flows between South Asia, the Gulf and global markets. TRW & Co is independent of the International Chamber of Commerce. To discuss a current dispute or the clauses in your trading or shipbuilding contracts, contact our arbitration team.
Frequently asked questions
Why choose ICC over LMAA for a shipbuilding contract?
Parties may prefer ICC for full institutional administration, scrutiny of draft awards, a seat outside London, or the ability to bring linked contracts and parties into one arbitration under Articles 8 to 11 of the 2026 Rules. LMAA arbitration remains popular for shipbuilding and is often faster and cheaper for straightforward disputes. The choice depends on value, complexity and the parties’ priorities.
Can I appeal an ICC award seated in London on a point of law?
Usually not. Section 69 of the Arbitration Act 1996 allows appeals on questions of English law unless the parties agree otherwise, and the waiver of recourse in Article 38(3) of the 2026 ICC Rules is generally understood to exclude such appeals. Parties who want a point-of-law appeal should provide for it expressly and take advice on its effect.
Can I arrest a vessel if my contract has an ICC arbitration clause?
Yes, subject to the law of the place of arrest. Article 29(2) of the 2026 Rules confirms that applying to a competent court for interim or conservatory measures does not infringe or waive the arbitration agreement. The application and any measures granted must be notified without delay to the ICC Secretariat and the tribunal.
Can ICC arbitrations in a commodity string be consolidated?
Only in limited circumstances. Under Article 11, the Court may consolidate where the parties agree, where all claims are under the same arbitration agreement or agreements, or where the arbitrations are between the same parties, arise from the same legal relationship and involve compatible agreements. Different parties up and down a string usually do not meet those conditions without agreement.
Is there a fast-track ICC procedure for small cargo claims?
Yes. Appendix V applies automatically to disputes up to US$4 million under agreements concluded from 1 June 2026, with an award due within six months of the case management conference. If all parties agree, Appendix VI Highly Expedited Arbitration targets an award within three months of that conference, and both tracks allow documents-only decisions.
Sources
General information only, not legal advice. References to the ICC, the ICC Court and the ICC Rules describe their published rules and practice; TRW & Co is independent of the ICC.